Mostrando 45 resultados

Descripción archivística
44 resultados con objetos digitales Muestra los resultados con objetos digitales
7753 · Unidad documental simple · April 1957
Parte de Architectural Drawings
  • Thomas Gray Laboratory School drawings part 1.pdf
  • The Thomas Gray Campus Laboratory School, opened in 1958, replaced Riverview as the campus laboratory school. The campus laboratory school closed in 1983 and, in 1984, was repurposed and renamed Engineering and Computing Center. The building was initially named for Thomas Gray, who graduated from St. Cloud State in 1872, served as the school's president from 1884 to 1890.
  • Location: Oversize drawings
  • This set of drawings contains 27 sheets.
8367 · Unidad documental simple · January 17, 1963
Parte de Architectural Drawings
  • Halenbeck Hall Drawings_part 1.pdf
  • Halenbeck Hall, completed in 1965, replaced Eastman Hall as St. Cloud State s home for physical education and athletics. The building was named for donor Philip Halenbeck. An addition was completed in 1980.
  • Location: Facilities Management
  • This set of drawings contains 62 sheets.
7567 · Unidad documental simple · August 1979
Parte de Architectural Drawings
  • Halenbeck Phase II drawings part 1.pdf
  • Halenbeck Hall, completed in 1965, replaced Eastman Hall as St. Cloud State s home for physical education and athletics. The building was named for donor Philip Halenbeck. An addition was completed in 1980.
  • Location: Facilities Management
  • This set of drawings contains 38 sheets.